Main -  Economy Department -  Investments -  List of sites for the implementation of investment projects

List of sites for the implementation of investment projects

LIST of land plots intended for subsequent provision by investors (or) organizations established in accordance with the established procedure in the Republic of Belarus by these investors or with their participation, for the construction of facilities under investment agreements concluded with the Republic of Belarus.


No. n/a

Site Location

Approximate area (ha)

The purpose of the possible use of the land plot

Availability of engineering and transport infrastructure

State body (state organization) to which (which) to apply for the conclusion of an investment agreement with RB

1.

ul. Voykova-Timiryazeva-Sverdlova

2.5

For the construction of a multifunctional entertainment and entertainment complex (with the condition of demolition of existing low-rise housing and office buildings; green area of not less than 25% of the area)

On the side of Voykova Street and Sverdlov Street is a power line. On the land plot there are three power supply lines. Along the street Voykova is located water mains ø150 mm, along the street Smolenskaya - water mains ø150 mm and ø400 mm, along the street Timiryazeva - water mains ø100 mm. Along Baranova str. there is sewerage network of ø1000 mm and ø500 mm. Along the Timiryazeva str. is low pressure gas pipeline network ø114 mm. Access to the land plot is carried out on the existing street network.

Brest Regional Executive Committee (11 Lenina St., Brest)

2.

Sovetsky Pr.

0,5

Cultural and entertainment center (Floors no more than 3 floors, landscaping area not less than 25%)

Along the avenue Soviet located sewerage network ø300 mm and water supply network ø800 mm, low pressure gas pipeline network ø108 mm at a distance of 200 m. Near the site on the eastern side is a cable power supply. Access to the site is carried out by the existing street network.

Brest Regional Executive Committee (11 Lenina St., Brest)

3.

Sovetsky Avenue

1.5 (the line of development to take no closer than 5.0m from the red line Sovetskogo Ave.)

For the construction of a multifunctional building business center (with the condition of demolition of existing low-rise housing)

On the land plot is located sewerage network ø200 mm, water pipeline ø50 mm, low pressure gas pipeline ø50 mm and ø114 mm. Along the street T.Shevchenko is a network of low pressure gas pipeline ø100 mm and medium pressure ø500 mm. Access to the land plot is carried out by the existing street network.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

4.

Sovetsky Avenue

1.15 (including under construction 1.0)

For the construction of a hotel complex (with the condition of demolition of existing low-rise housing)

Along Dubovskogo lane are electricity network and low pressure gas pipeline network ø114 mm. Access to the land plot is carried out on the existing street network.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

5.

ul. Sovetskaya-Mitskevicha-Gagarina

0,65

for the construction of a multifunctional complex (hotel complex, apartment building, administrative and commercial facilities (subject to the demolition of low-value housing, the resettlement of citizens in accordance with the procedure established by law, reconstruction of infrastructure)

On the land plot is a network of electricity and low pressure gas pipeline ø100 mm. Along the street Gagarin is low pressure gas pipeline network ø89 mm. Water pipeline network ø150 mm is located along Sovetskaya str., Gagarin str. and Mickiewicza str. The drainage network Ø150 mm is located along the Mickiewicza Str., Ø200 mm along Gagarina Str. Access to the land plot is carried out by the existing street network.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

6.

ul. 41 Francisca Skorina St.

4,0

For the construction of a production base of an industrial enterprise of the fourth class (according to sanitary classification)

It is necessary to install two 10 kV cells with switching devices on the 110 kV Zapadnaya substation, to lay two 10 kV CLs, to build a distribution station (about 3.6 km in length). It is necessary to lay water pipeline network with the length of about 2 km along the projected Frantsysk Skoryna St. (from the water pipeline network Ø 200 mm on Professionnaya St. to the water pipeline network Ø 150 mm on Brestskaya St., 295). The distance of about 2 km. Connecting to the sewerage OS network, it is necessary to build build build pressure and gravity sewers with the length of 1,4 km. Medium pressure gas pipeline ø63 mm on Prigorodnoy Lane 1 and Prigorodnoy Lane 2, medium pressure gas pipeline ø 133 mm and 108 mm to the boiler plant treatment plants.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

7.

ul. Brestskaya, 315

7,1

For the construction of a production base of an industrial enterprise of the fourth class (according to sanitary classification)

It is necessary to install two 10 kV cells with switching devices on the 110 kV Zapadnaya Substation, to lay 10 kV CLs, and to build a distribution substation (3 km in length). It is necessary to lay water pipeline network with the length of about 2 km on the projected street Frantsysk Skoryna (from the water pipeline network ø 200 mm on the Professional street to the water pipeline network ø 150 mm on Brestskaya Str, 295). Connecting to the sewerage network OS, it is necessary to build pressure and gravity sewers 1,4 km long. Medium pressure gas pipeline ø63 mm on Prigorodniy lane 1 and Prigorodniy lane 2, medium pressure gas pipeline ø 159 mm on the territory of OPMS-115.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

8.

ul. Fabrichnaya

5,3

For the construction of a production base of an industrial enterprise of the fourth class (according to the sanitary classification)

It is necessary to coordinate the connection to the network 10 kV (0,4 kV) with RUP "BPHO", if from the power grid - it is necessary to lay 2 CL-10 kV from the substation 110 kV KhBK with the construction of the TP. It is necessary to lay a section of the water pipeline network length of about 470 m water network ø 200 mm on the street Gaeva to the water pipeline network ø 200 mm on Prospekt Masherov (about 470 meters from the land). It is necessary to design and lay a section of sewage network of about 700 m from the site to the collector ø 200 mm at ul. Gayevaya (700 meters from the land). Medium pressure gas pipeline dia.159 mm (105 meters from the land).

Brest Regional Executive Committee (Brest, 11 Lenina St.)

9

7 Zelenaya St.

0,37

To place a public building (hotel 2-4 floors) with the condition of the withdrawal of land in accordance with the legislation and demolition, located on them an individual apartment building on the street Green, 5, and garage on the street Green, 9.

Electricity: to connect will require the construction of transformer substation 10/0,4 kV with the laying of cable lines of 10 kV from TP-2, TP-2a and removal of electric grid 10kV from the construction site. Heat: along the site laid gas pipeline low pressure (0,003 MPa), dia. 89 mm, on the site laid gas line-in low pressure (0,003 MPa), dia. 57 mm. Water supply: near the site passes the network of water diameter 150 mm. Domestic sewage: near the site passes sewer line diameter 150 mm, which is on the balance sheet of individual developers. Access to the site is on the existing street network.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

10

Professional Street

3

for placement of production facilities, except for enterprises of food industries, facilities for the production of medicines and facilities for the cultivation of crops used for human nutrition (with the conditions: -regulation of use and development of the land plot according to the city planning passport of the land plot 010/010/35.

At the site are perennial greenery, demolition of which is determined by the design decision in accordance with the legislation) According to the specifications of operating organizations of engineering communications within the boundaries of the land is not available. The point of possible connection to the networks of gas supply-gas pipeline medium pressure (up to 0,3 MPa) D = 219st subject to the construction of the site distribution of gas pipeline, gas pipeline entry. On the Professional street. pass networks of water supply of low pressure diame. 200 mm and on the projected street of Francisca Skorina - diame 200 mm, internally-plot sewage network diameter 160 mm are in the treatment facilities. To connect to the network must apply to the CUPP "Vodokanal" for specifications. On the networks of electricity - you need to build a power line-10/0, 4kV and transformer substation Access to the site is carried out by the existing street network. The site is located in the protection zone of the third zone of water intake underground water "Volokhva

Brest Regional Executive Committee (11 Lenina St., Brest)

11

Dubovo district

3,2

for the construction of residential complexes (the regulation of the use and development of the land according to the urban passport of the land 010/010/32. with the conditions: -development of the project and construction according to the design profile of the sections of streets, limiting the quarter according to the detailed plan; removal of utilities from under the construction spot.

Land has restrictions on the use in the protected zones of electric networks voltage 10/6/0,4 kV, communication lines. The site is located in the protection zone of the third zone of water intake underground water "Volokhva" and sludge collector. The point of possible connection to the networks of gas supply-gas pipeline medium pressure (up to 0,3 MPa) D = 159st per. 3 Novatorov with the construction of a section of distribution of gas pipeline, gas pipeline-inlet; pipeline low pressure (up to 0,003 MPa) D = 219st street Starodubovskaya with the construction of a section of distribution of gas pipeline, gas pipeline-inlet; projected low pressure gas pipeline ((0,003 MPa) D = 110PE street. Tsiolkovsky with the construction of a section of distribution of gas pipeline, gas pipeline-inlet. In the area of the site there is a network of low pressure water supply diam. 110 mm and sewerage network diam. 160mm, passing on the street Starodubovskaya and being on the balance of individual developers - to connect to this network must obtain the permission of individual developers. The nearest network of water supply of low pressure diam. 300 mm and sewerage network diam. 200 mm are about 400 meters on st. Tsiolkovsky. To connect to the network should apply to the CUPP Vodokanal for specifications. On the power supply networks - the projected network 0,4 kV from the switchboard-34

Brest Regional Executive Committee (11 Lenina St., Brest)

12

ul. Vilchkovskogo, 184E

5,0

placement of production facilities, except for enterprises of food industries, facilities for the production of medicines and facilities for the cultivation of crops used for human nutrition

At the site there are power supply networks VL0,4 kV, subject to removal from under the construction site, as well as perennial greenery, demolition of which is determined by the design decision in accordance with the legislation) the point of possible connection of the object to the gas supply network: medium pressure gas pipeline (to 0,3 MPa) D=219st street. Vilchkovskogo with the construction of the site distribution of gas pipeline, gas pipe-inlet; gas pipeline of high pressure (up to 0,6 MPa) D = 90PE with the construction of the site distribution of gas pipeline, gas pipe-inlet (subject to the written consent of the balance holder of OOO "Eurotorg". There is no possibility of connection to the heating network. The water supply network, which is on the balance of KUPP "Vodokanal" runs along Wilczkowski str. There are off-site networks of water supply and sanitation, which are on the balance of departmental enterprises and organizations, to connect to these networks must obtain the permission of the owners. Power supply: you need to build a power line-10/0,4 kV and transformer substation

Brest Regional Executive Committee (Brest, 11 Lenina St.)

13

ul. Kirov Street (near the intersection with Tekstilnaya Street)

0,1

to accommodate the charging infrastructure of electric transport regulations of use and development of the land according to the urban passport of the land plot 027/027/27

The site is partially crossed by utilities (heat, sewerage, water, gas supply networks), for which it is necessary to comply with the protection zones. The point of possible connection of the object to the gas supply network: medium pressure (up to 0,3 MPa) distribution gas pipeline D = 90 mm with the construction of a gas pipeline-inlet. There is a possibility of connecting to the networks of Baranovichi heating networks. Point of connection to power supply networks - RU-10kV PS-110/35/10kV "Yuzhnaya" (to install cameras CFA with BB-10kV in RU-10kV PS-Yuzhnaya, to lay the line-10kV, perform construction of TP-10/0, 4kV rated power)

Brest Regional Executive Committee (Brest, 11 Lenina St.)

14

Ul. Williams St. (near Novaya St.)

0,1

to accommodate the charging infrastructure of electric transport regulations of use and development of the land according to the urban passport of the land plot 010/010/20

The site is partially crossed by utilities (sewage networks, electricity, communications), for which it is necessary to comply with the protection zones. The point of possible connection of the object to the gas supply network: medium pressure gas pipeline (up to 0,3 MPa) D=219 st with the construction of the gas pipeline-inlet; low pressure gas pipeline (up to 0,003 MPa) D=133 st with the construction of the gas pipeline-inlet. Point of connection to power supply networks - RU-10kV PS-110/10kV "KHBK" (to lay the CL-10kV, perform the construction of TP-10/0, 4kV rated capacity)

Brest Regional Executive Committee (Brest, 11 Lenina St.)

15

ul. Fabrichnaya St., 19B

0.5430

to accommodate the industrial base of an industrial enterprise Regulations for the use and development of the land according to the urban passport of the land plot 156/156/06

The site is partially crossed by utilities (water and electricity networks), for which it is necessary to comply with the protection zones. The point of possible connection of the object to the gas supply network: the existing distribution pipeline of medium pressure (up to 0,3 MPa) D=159st with the construction of a section of the distribution gas pipeline, gas inlet. It is possible to connect to the water pipeline network dia. 110 mm, which is in the operational responsibility of "BelKompozitIndustriProduct" LLC (it is necessary to obtain the permission of the network owner). The nearest sewerage network is located at a distance of about 300 m from the site. The network - in the operational responsibility of LLC "BelKompozitIndustriProduct" and ALC "Planet Iron". (it is necessary to obtain the permission of the owner of the network). Points of possible connection to the power supply networks - distribution networks of 10/0,4 kV enterprise "KarbonMekhanika" and JSC "Baranovichi PHBO"

Brest Regional Executive Committee (Brest, 11 Lenina St.)

16

in the park named after. 30th anniversary of the All-Union Leninist Young Communist League

1,9470

for the construction and maintenance of an amusement park

Within the boundaries of the land plot there are no rain sewage networks. Drainage of precipitation is possible in the rain sewer network with a diameter of 400 mm, located in the park them. 30-th anniversary of Komsomol. Drainage of atmospheric precipitation from the roof of the projected buildings to provide surface. Heating networks are absent. On the street. Gorky passes water supply network diameter of 150 mm and sewerage network diameter of 200 mm. On the territory of the site is laid gas pipeline medium pressure (0,3 MPa) diameter 108 mm, gas pipeline low pressure (to 0,003 MPa) diameter 159 mm and 57 mm, there is a building GRP-26, is located anode field, contact device with a conclusion under the carpet. For power supply it is necessary to build a transformer substation 6/0,4 kV of the calculated capacity, a cable line 6 and 0,4 kV in the necessary volume. A 6 kV cable line runs along the site.

Brest Regional Executive Committee (Brest, 11 Lenina St.)

BREST OBLAST EXECUTIVE COMMITTEE Official website of the Republic of Belarus
Official website of the president of the Republic of Belarus
National legal information website of the Republic of Belarus
National Center for Electronic Services